ALERTS: THIS SITE IS UNDER CONSTRUCTION. PLEASE VISIT OUR CURRENT WEBSITE.
Fentanyl Resources | Community Health Assessment | Citizens Connect Crime Reports
Road Construction Info
Please see details below about the FM 621/Staples Road Corridor Safety Improvements Project, Phase 2, which began this week. We ask all who use the roads in this area to drive with caution, follow posted signs, leave a little extra time to get where you need to go and pay attention especially when workers are on the job. (Click image to enlarge map.)
Commissioner: Commissioner Debbie Ingalsbe, Precinct 1
Project limits: 380 Feet East of Picasso Drive to 1,000 Feet East of CR 266 (Old Bastrop Highway)
Description: The Texas Department of Transportation (TxDOT) will construct pavement widening, turn lanes, and shoulder. drainage and traffic signal improvements.
Project Team: RPS was the Design Engineer. Joe Bland Construction, LP is the Contractor. TxDOT will provide CEI services.
Construction value: $3,199,566.89
Funding: Hays County 2016 Road Bonds, Capital Area Metropolitan Planning Organization (CAMPO)-awarded Federal funds, and TxDOT Highway Safety Improvement Funds.
Date construction awarded: August 30, 2022
Estimated construction end: Early 2024
Quick Links
Hays County, Texas
Main County Mailbox:
712 S. Stagecoach Trail
San Marcos, Texas 78666
Main Number: 512-393-7779
Connect with us!
©Copyright 2023-24 Hays County, Texas | Website by Munission