ALERTS: THIS SITE IS UNDER CONSTRUCTION. PLEASE VISIT OUR CURRENT WEBSITE.
Fentanyl Resources | Community Health Assessment | Citizens Connect Crime Reports
Learn more about the Dripping Springs Southwest Connection Study!
Hays County is conducting a study to identify a route that will extend RM 150 from the intersection of RM 12 at RM 150 and connect to US 290 west of Dripping Springs. The purpose of this study is to plan ahead, so that Hays County can continue to improve transportation, safety, connectivity, and mobility and provide more options for travelers.
Why is the Study Needed?
Study Goals
Process
Through the Dripping Springs Southwest Connection Study, the County is working with local stakeholders and property owners to develop preliminary engineering plans (up to 20% design) for a future roadway. The intent is to minimize environmental impacts and impacts to property owners and to provide a safe, direct route between RM 12 and RM 150 southwest of Dripping Springs. The study will not include final design or construction plans.
Visit the
project page to learn more, including timeline and FAQs!
Quick Links
Hays County, Texas
Main County Mailbox:
712 S. Stagecoach Trail
San Marcos, Texas 78666
Main Number: 512-393-7779
Connect with us!
©Copyright 2023-24 Hays County, Texas | Website by Munission